Friday, November 15, 2013
Some Fukushima fuel rods were damaged before 2011 catastrophe
(RT) Three of the spent fuel assemblies that will be pulled from the Fukushima nuclear plant during a year-long operation were damaged before the 2011 earthquake and tsunami crippled the Japanese facility.
Tokyo Electric Power Co. (TEPCO), which operates the plant, said the damaged assemblies - 4.5 meter high racks with 50 to 70 rods of highly irradiated used fuel - won’t be lifted from the plant’s Reactor No. 4 when a large steel chamber, or cask, is employed to move over 1,500 assemblies to safe storage, Reuters reports.
In an 11-page information sheet released in August, TEPCO said one of the assemblies was even damaged as long ago as 1982, when it was bent out of shape during a transfer.
In 2010, TEPCO said that another two spent fuel racks in the reactor’s cooling pool possibly contained wire trapped in them. Rods in the assemblies have small cracks and are leaking low-level radioactive gases, TEPCO spokesman Yoshikazu Nagai told Reuters on Thursday.
Read full article here.
Labels:
World News
Subscribe to:
Post Comments (Atom)

0 comments:
Post a Comment